Boney Creek Development and Surespan have forged a strong partnership focused on delivering complex infrastructure and environmental projects in northern BC. Through this collaboration, Boney Creek provides local capacity, Indigenous representation, and project support aligned with community values, while Surespan brings its expertise in heavy civil construction and structural solutions.
This partnership exemplifies Boney Creek’s role in bringing economic development and skilled employment opportunities to the Laxgalts’ap community through strategic alliances. Working alongside Surespan, Boney Creek continues to support vital infrastructure that serves both industrial needs and ecological priorities across the Nass Valley and beyond.
PRGT Ginluulak Road Bridge Installations
Delivered the structural design, fabrication, and installation of nine permanent forestry-style bridge structures for the Prince Rupert Gas Transmission (PRGT) project.
The bridges included:
7 All-steel portable bridges
2 Steel girder bridges
8 Bridges on spread footings and towers
1 Bridge on a lock block substructure
Our Projects
Treaty Creek Bridges (KSM Project)
Supplied and installed 10 steel bridge structures to support access for the KSM Project along Treaty Creek Road.
Work involved excavation, spread footing and tower installation, placement of geotextile and riprap, precast concrete ballast walls, and installation of modular timber deck panels with geo-fabric containment and wear decking.
KSM Glacier Creek Fish Habitat Offset Pond
Installed over 500 linear meters of sheet pile shoring to support dewatered excavation for a fish habitat offset pond. Sheet piles were driven into challenging glacial till and cobble using multiple techniques, then fully extracted and demobilized upon project completion, supporting environmental sustainability in the region.

PRGT Bridge Installation

Treaty Creek Bridge
KSM Glacier Creek Fish Habitat Offset Pond